Chandigarh Smart City Ltd.

Water Supply Project

Salient Features

Project Cost:-  162.06 Crores

  • CWR 18200KL – 01 Nos.
  • DI-K7 Pipeline(100MM to 600MM) – 15,283 Mtr.
  • AMR WATER METER – 15,000 Nos.
  • Clear Pumping Station – 02 Nos.
  • Pumping Machinery including SCADA System
  • 5KW-55KW – 20 Nos.
  • Electric Transformer & Generator Set
  • 250KVA-1000KVA – 07 Nos.
  • House Hold Connections Services – 15,000 Nos.
  • And Other Allied Works.

WATER PROJECTS COMPLETED ACROSS INDIA

Agra Smart City Ltd. Water Supply Project

Salient Features

Project Cost: 158.67 Crores

  • OHSR (2000KL-4200KL) – 05 Nos.
  • MS Pipeline (1200MM): 6,690 Mtr.
  • DI-K9 Pipeline (150MM to 500MM): 8,881 Mtr.
  • DI-K7 Pipeline (200MM to 450MM): 18,848 Mtr.
  • HDPE-PN6 Pipeline (110MM to 225MM): 1,54,636 Mtr.
  • Clear Pumping Station, 2 Unit.
  • House Connection Service: 17,225 Nos.
  • AMR Smart Ultrasonic Water Meter: 17,225 Nos.
  • Pumping Machinery including SCADA System
  • 11KW-90KW – 12 Nos.
  • Electric GSS with Transformer and Generator set
  • 315KVA-750KVA – 2 Nos. (Transformer)
  • 300KVA-750KVA – 2 Nos. (DG Set)
  • And Other Allied Works