Chandigarh Smart City Ltd.
Water Supply Project
Salient Features
Project Cost:- 162.06 Crores
- CWR 18200KL – 01 Nos.
- DI-K7 Pipeline(100MM to 600MM) – 15,283 Mtr.
- AMR WATER METER – 15,000 Nos.
- Clear Pumping Station – 02 Nos.
- Pumping Machinery including SCADA System
- 5KW-55KW – 20 Nos.
- Electric Transformer & Generator Set
- 250KVA-1000KVA – 07 Nos.
- House Hold Connections Services – 15,000 Nos.
- And Other Allied Works.
WATER PROJECTS COMPLETED ACROSS INDIA
Agra Smart City Ltd. Water Supply Project
Salient Features
Project Cost: 158.67 Crores
- OHSR (2000KL-4200KL) – 05 Nos.
- MS Pipeline (1200MM): 6,690 Mtr.
- DI-K9 Pipeline (150MM to 500MM): 8,881 Mtr.
- DI-K7 Pipeline (200MM to 450MM): 18,848 Mtr.
- HDPE-PN6 Pipeline (110MM to 225MM): 1,54,636 Mtr.
- Clear Pumping Station, 2 Unit.
- House Connection Service: 17,225 Nos.
- AMR Smart Ultrasonic Water Meter: 17,225 Nos.
- Pumping Machinery including SCADA System
- 11KW-90KW – 12 Nos.
- Electric GSS with Transformer and Generator set
- 315KVA-750KVA – 2 Nos. (Transformer)
- 300KVA-750KVA – 2 Nos. (DG Set)
- And Other Allied Works